Industries/Dental Specialty Practices
Industry pack · Dentrix, Eaglesoft, Open Dental

Every referral call answered. Every consult booked. Even during surgery.

Oral surgery, orthodontics, endodontics, and periodontics run on referrals, multi-visit treatment plans, and insurance pre-authorisations. The phone is where all of that arrives. An AI receptionist built for specialty dental answers in two rings, books into your practice system, and escalates post-op pain to the on-call doctor.

  • Live in under a week
  • Two-week refundable pilot
  • HIPAA-ready

Works with

  • Dentrix and Dentrix Ascend
  • Eaglesoft
  • Open Dental
  • Cloud 9 Ortho
  • Denticon
  • Google and Outlook calendars
The problem

Specialty practices have a harder phone than general dentistry

Referral-heavy workflow

General dentists and their staff call to coordinate care. A missed call is a lost referral relationship, not just one patient.

Multi-visit scheduling

Consult, procedure, follow-ups, adjustments. Each patient means five to twenty bookings and reschedules.

Insurance complexity

Pre-authorisations, out-of-network questions, and payment plans take long calls your front desk cannot always give.

Urgent post-op calls

Severe pain, bleeding, or a broken appliance needs a human fast, at 9pm, on a Saturday.

What the agent does

A front desk that never steps away

Books and reschedules

Checks real availability in your practice system and books consults, procedures, and follow-ups with the right provider and chair time.

Handles referrals

Captures referring-office details, reason for referral, and urgency, then creates the patient and alerts your coordinator.

Answers insurance basics

Plans accepted, what pre-authorisation means, payment options. Hands off anything specific to a person, with notes.

Triages emergencies

Recognises pain, swelling, bleeding, and post-op keywords and warm-transfers or texts the on-call doctor with the transcript.

Sends prep reminders

Outbound calls or texts before surgery: fasting, medications, driver arranged. Confirms or flags for staff.

Stays HIPAA-safe

Recording disclosure, encrypted transcripts, BAA signed, minimum-necessary data in every note.

Integrations

Built for the systems specialty practices run on

SystemWhat the agent can do
Dentrix / Dentrix AscendLook up patients, read provider availability, create and move appointments, add call notes to the chart.
EaglesoftAvailability lookup, appointment creation via the scheduling bridge, patient lookup by phone number.
Open DentalFull API: patients, appointments, insurance plans on file, treatment-plan status for informed answers.
Cloud 9 OrthoOrtho-specific: adjustment appointments, broken-bracket emergencies, contract and payment questions routed correctly.
DenticonMulti-location practices: book into the right office, share one number across locations.

Where a vendor has no public API, we work through their approved integration partners or a scheduling bridge. We confirm the exact path at discovery.

Example

What a month looks like for a two-location orthodontic practice

Illustrative scenario with placeholder numbers. Real client results will replace these.

Bright Smile Orthodontics (illustrative)

A two-location orthodontic practice was missing roughly a third of inbound calls during peak hours and everything after 5pm. The AI receptionist took over overflow first, then the main line. New-patient consults are booked directly into Cloud 9, broken-appliance calls are triaged, and the front desk handles the patients in the room.

0missed new-patient calls after 5pm
31%more consults booked in month one
14 hrsfront-desk time back every week

Read the case study

Recommended product

Start with the dental pack

AI Receptionist

The dental specialty pack ships with intake, insurance, recall, and emergency-triage scripts and the integrations above. Business tier and up includes a BAA. From $299/mo, live in under a week.

See AI Receptionist
FAQ

Frequently asked questions

Anything else, a human replies within one business day.

Ask us directly
Is it HIPAA compliant?

Yes. We sign a BAA, transcripts are encrypted at rest in the US, recording is disclosed and optional, and notes contain only what the appointment needs.

Will patients accept talking to an AI?

Most just want the appointment. The agent identifies itself, speaks naturally, and offers a human at any point. Practices typically see no drop in booking rate versus voicemail-and-callback.

Can it book across two locations?

Yes. One number, location chosen by the caller or by their record, booked into the right office and provider.

How does it handle a true emergency?

Your rules. Typically: warm transfer to the on-call doctor during hours, SMS with transcript after hours, and always a logged record.

Hear it handle a referral call

Book a demo

Call our demo line at +1 (202) 868-8706 and pretend to be a referring office. Then book 30 minutes and we will set it up on your overflow line.

No contracts on products · Two-week refundable pilot · You keep your number and your data